Trafford Wharf, Manchester
Beautifully modern development in a stunning riverside setting
Trafford Wharf
Ideally situated with close connections to key leisure and employment hubs across Manchester, Trafford Wharf is a modern development which retains its residential appeal with a stunning riverside setting.
Live Stream of Site: Trafford Wharf
Why Invest in Trafford Wharf?
Trafford Wharf has features such as large communal spaces and a roof terrace with views of the city and MediaCityUK. There will be retail space on the ground floor, along with a 24/7 concierge. The Trafford Wharf development is set to be one of the most sought after in the city and it is offering HIGH YIELDS!
Trafford Wharf Location
Close to Media City and the Old Trafford Football Stadium making Trafford Wharf a huge draw for future tenants. The development will be close to the upcoming Wharfside tram stop, providing the Trafford Wharf residents a fast and reliable access to the city and all of the major shopping lifestyle and entertainment districts in Manchester.
For further information please contact Flambard Williams:
Head Office: +44 (0)20 7183 0646
Alternatively to speak directly to a specialist agent about Trafford Wharf complete the form below.
Property Highlights
- 1 - 2 Beds
- 1 - 2 Baths
- 40 - 70 sq.m
- Wharf End,
Manchester. M17 1AB
Excellent Transport Links
Fantastic Views
Parking Available
Communal Podium
Roof Terrace
Retail Space on Ground Floor
24/7 Concierge
250 Year Leasehold
Completion Q2 2021
July 2020
Completed Work
All the ground and foundation works have been completed along with concrete work.
The pre-cast concrete stairs have all been installed and completed.
the floors on each of the blocks have been completed up to the 16th floor of block 2 and the 14th floor of block 1.
Waterproofing work to the building external retaining walls has been fully installed.
Brickwork installation is complete up to the 3rd floor of block 2 and to the ground floor of block 1
All the block work to the internal areas has been completed.
Completion of the electrical first fix installation in 106 apartments across the development.
Forthcoming works on site
Installation of the permanent handrails to the stairs
completion of the lift works to the building cores
Installation of the pan and rebar to the roof floor of Block 1 and the the 17th floor of Block 2
Completion of all brickwork and blockwork to the remaining floors
Weatherboard installation to the 14th floor of Block 2 and 10th floor of Block 1
Installation of the insulation and cavity fire barriers
Window installation to the remaining floors across both blocks
Commencement of the internal partitioning, sanitary, joinery, drainage and plumbing works across all apartments
Installation of the kitchens to apartments on the 1st floor of Block 2
Septmeber 2019
- The lift and stair cores are almost complete
- Concrete work has been completed up to the second floor
- The council has approved the brickwork for the site to progress
May 2019
- Groundworks are now well underway
- Full hoarding and site offices have been installed onsite
- Piling and wider groundworks are being carried out