The Roscoe

The Roscoe is a boutique collection of 82 beautifully presented 1 and 2 bedroom apartments in the heart of Liverpool city centre. This development is within walking distance of every amenity and expertly designed for the burgeoning rental market. The prime central location and build quality will ensure the apartments are reliably let to high calibre tenants long term.

Why Invest in The Roscoe?

Upper Central is a £2 billion flagship regeneration scheme covering 56 acres. Set to create 7,000 new jobs, it also aims to create a vibrant central zone with new shops, offices, galleries, bars, restaurants, gyms and university space on a scale equivalent to London’s Kings Cross. A key component of Upper Central will be the new commercial space for tech and digital businesses, alongside futuristic educational space. The Roscoe will become a natural choice for renters working in this sector which will allow investors to capitalise on the £2 billion regeneration on its doorstep.

The Roscoe Location

Set in the heart of Liverpool’s city centre and will appeal to the city’s buoyant rental market. Owning a rental apartment in this area will help to safeguard your returns for many years to come.

  • 2 minutes walk to £2 billion upper central investment (7000 new jobs)
  • 2 minutes walk to Liverpool John Moores University
  • 6 minutes walk to Central Station
  • 6 minutes walk to China Town
  • 7 minutes walk to the University of Liverpool
  • 8 minutes walk to Liverpool Lime Street Station
  • 9 minutes walk to Liverpool ONE shopping centre
  • 12 minutes walk to Royal Liverpool University Hospital

 

For further information please contact Flambard Williams: 

Head Office: +44 (0)20 7183 0646

Alternatively to speak directly to a specialist agent about The Roscoe please complete the form below.

November 2021

• SFS (steel framing system)
substantially complete
• External boarding substantially
complete
• Soils installation substantially
complete
• Mains water ducting installed
• LV & HV ducting for substation
installed
• Roof works ongoing
• First fix M+E well under way
and ongoing
• Blockwork for lift core ongoing
• Door casings ongoing
• Fan ducting ongoing
• Sprinkler system procured
• Windows awaiting delivery
• Substation design submitted
and approved

September 2021

External Work
• SFS (steel framing system)
substantially complete
• External boarding substantially
complete
• Fire barrier installation ongoing
• Brickwork ongoing
• Roof timbers complete
• Roof boarding ongoing

Internal Work
• Internal metal stud walls ongoing
• Internal boarding commenced
• Soils installation ongoing
• First fix electrical & Mechanical
commenced
• Scaffold lift shaft commenced
• Blockwork lift shaft commenced
• Various packages procured

March 2021

January 2021