Sold out!

A truly exceptional standard of student accommodation, putting quality at the heart

A “Studio-only” development of 222 high quality units, with panoramic views over Nottingham. The development is 7 storeys in total with the 7th floor set back providing roof terrace access to many of the Studios on this floor. Sizes range from 20m2 to 46m2 with several units offering 2 bedrooms to allow shared living. Each studio is designed to respond to current market demand for high quality accommodation, including; en-suite bathrooms, bespoke kitchens and separate living, study and sleeping areas.

The building provides unrivalled amenities including; 24 hour reception, cycle storage, parcel delivery room, launderette, group and individual study areas, double height “hotel style” reception, games zones, private dining room, mezzanine level quiet sector and “coffee shop style” social spaces. Situated opposite Nottingham’s central train and tram stations just on the edge of the compact City Centre, The Laceworks is ideally located to benefit from both main university campuses and within easy walking distance to shops and restaurants, creating a perfect location for a luxury student residence.

Property Highlights

  • Studio
  • 1 Bath
  • 20 - 46 sq.m
  • Summer Leys Lane
    Nottingham. NG2 3AN
  • Exclusive Roof Terraces
  • 24 Hour Reception
  • Cycle Storage
  • Games Zones
  • Parcel Delivery Room
  • Fully Furnished
  • Fully Managed
  • 7.75% NET Rental Yields
  • 5% Interest on Deposit Funds

June 2019

- The building superstructure is now 100% complete.
- Brickwork on the outer skin of the external walls is progressing as per the programme, with over 50% of these works completed
- Internal fit-out is progressing well with the final fit-out of the first floor nearing completion
- Works will continue up the building to allow for snagging of rooms prior to practical completion
- The lettings show unit is now complete and all works are on track for the projected completion date.

September 2018

- Piling and groundworks complete
- Steel and metzec frame phase 1 complete, phase 2 underway
- Stair and lift cores progressing
- Upper floor installation following up being the frame
- Scaffolding erected and lower level external wall construction has commenced
- Work remain on programme to Complete end of August 2019

May 2018

- Piling & 50% of the groundwork’s now complete
- The first of the steel frame has been erected and the rest will follow as the groundworks complete