A Brand New Statement Building for Manchester

This iconic tower boasts 28 stories of uninterrupted views across the city and beyond as well as being home to Manchester’s two most exclusive penthouses.

Named to highlight its unique and central location at the AXIS point to this great city’s major transport links, Central Business District, famous shopping offer, and key attractions, Axis Tower has become one of Manchester’s most sought after places to live.

Wherever you need to be, Axis Tower is well placed to make the connection. You’re just a short walk from all Manchester has to offer. If you don’t feel like walking or need to be there in a hurry then just hop on the Metrolink or grab one of the many buses that pass by your front door.

Property Highlights

  • 1 - 3 Beds
  • 1 - 3 Baths
  • 51 - 290 sq.m
  • Whitworth Street West
    Manchester. M1 5LH
  • Prime City Centre Location
  • 24hr Concierge Service
  • Secure Parking Available
  • Stunning Design
  • Panoramic Views
  • Expected 6-7% Rental Yields

December 2019

- The reception area is near to completion
- Canal towpath works have commenced
- The canal bridge cladding is also being fitted and paviours are being installed
- Highway works have been completed along Withmore Street to the front of the building
- Highway works are underway on Trafford Street to the rear

September 2019

- Externally the facade of the entire building is now complete
- the bridge across the canal has been installed
- Internally stick curtain walling on the lower floors is complete
- Kitchens have been fitted up to the 26th floor

June 2019

- Works on the external façade of Axis are now complete with the exception of the final section on the Whitworth Street elevation
- Infill of hoist affected apartments has commenced with partitions being fixed
- Bathrooms being fitted up to the 26th floor
- Kitchens are being fitted up to the 25th floor whilst the crash deck over the canal has been removed

February 2019

- Façade complete except Whitworth Street elevation
- Roof complete
- Partitions being fixed up 25th floor
- Bathrooms being fitted up to 22nd floor
- Kitchens being fitted up to 17th floor
- Tower crane removed

November 2018

- Facade complete except Whitworth Street elevation
- Roof complete
- Building roof maintenance unit complete
- Partitions being fixed up 23rd floor
- Fit out of apartments commenced
- Bathrooms being fitted up to 14th floor
- Kitchens being fitted up to 11th floor

August 2018

- Concrete frame complete
- Façade completed to level 22
- Apartment internal partitions commenced
- M&E first fix commenced

May 2018

- Core walls poured to the 25th Floor
- Concrete complete to the 21st Floor
- Cladding completed to the 10th Floor

April 2018

February 2018

- Concrete core walls poured to the 17th Floor
- Concrete floors poured to the 12th Floor
- 2nd floor cladding commenced

November 2017

- Reinforced concrete core walls poured up to the 11th Floor
- 8th floor slab now poured
- Stairs and Landings installed to the 7th Floor

August 2017

- Reinforced concrete core walls poured up to the sixth floor
- First floor slab poured, second floor slab now commenced
- Raking columns complete to the first floor, second floor columns now commenced

June 2017

- Reinforced concrete ground floor slab 75% complete
- Continued pour of non-core walls to ground floor
- Ground to first floor core wall poured
- Commenced lower ground floor raking columns

April 2017

- Work is now well underway and on schedule
- Reinforced concrete Lower Ground floor slab now complete
- 75% of non core walls complete
- Tower Crane was erected mid April to a height of 54m (Level 17)
- Temporary loading platform over the canal has been completed
- Preparations for the ground floor slab have now commenced

Property enquiry

FX Illustration

£
Approx.

Disclaimer
Rates are updated every 24hrs

Stamp Duty

£
Approx.

Latest news and publications

Our customers

Not just a sale

I recall working through Flambard Williams to acquire my first property. Having met more real estate agents (over 50). I found them to follow up on everything. All concerns such as location, development company, solicitors, payment reminders were handled by them. They have local knowledge of the areas and are aware of the development and the surrounding. I do wish they also had a unit for London and other cities.

Asif
More than a sale

We dealt with Charleigh Cooper and I found her to be excellent and responsive to every question, query I have had. She has checked in with me on the progress through out and followed up with the developer and solicitors as requested which is over and above the service of a selling agent and better than expected.

Mrs R Shah
Martyn Taylor and the team at Flambard Williams

Martyn Taylor provided consistently professional service, patience, and professionalism as we negotiated the purchase of an investment property from abroad. His knowledge and expertise are exemplary and I commend him, his colleagues, and the company for their courtesy.

Dr J Jacobs

Proud to be featured in