A Brand New Statement Building for Manchester

This iconic tower boasts 28 stories of uninterrupted views across the city and beyond as well as being home to Manchester’s two most exclusive penthouses.

Named to highlight its unique and central location at the AXIS point to this great city’s major transport links, Central Business District, famous shopping offer, and key attractions, Axis Tower has become one of Manchester’s most sought after places to live.

Wherever you need to be, Axis Tower is well placed to make the connection. You’re just a short walk from all Manchester has to offer. If you don’t feel like walking or need to be there in a hurry then just hop on the Metrolink or grab one of the many buses that pass by your front door.

Property Highlights

  • 1 - 3 Beds
  • 1 - 3 Baths
  • 51 - 290 sq.m
  • Whitworth Street West
    Manchester. M1 5LH
  • Prime City Centre Location
  • 24hr Concierge Service
  • Secure Parking Available
  • Stunning Design
  • Panoramic Views
  • Expected 6-7% Rental Yields

September 2018

- Concrete frame complete
- Façade completed to level 22
- Apartment internal partitions commenced
- M&E first fix commenced

May 2018

- Core walls poured to the 25th Floor
- Concrete complete to the 21st Floor
- Cladding completed to the 10th Floor

April 2018

February 2018

- Concrete core walls poured to the 17th Floor
- Concrete floors poured to the 12th Floor
- 2nd floor cladding commenced

November 2017

- Reinforced concrete core walls poured up to the 11th Floor
- 8th floor slab now poured
- Stairs and Landings installed to the 7th Floor

August 2017

- Reinforced concrete core walls poured up to the sixth floor
- First floor slab poured, second floor slab now commenced
- Raking columns complete to the first floor, second floor columns now commenced

June 2017

- Reinforced concrete ground floor slab 75% complete
- Continued pour of non-core walls to ground floor
- Ground to first floor core wall poured
- Commenced lower ground floor raking columns

April 2017

- Work is now well underway and on schedule
- Reinforced concrete Lower Ground floor slab now complete
- 75% of non core walls complete
- Tower Crane was erected mid April to a height of 54m (Level 17)
- Temporary loading platform over the canal has been completed
- Preparations for the ground floor slab have now commenced

Property enquiry

FX Illustration

£
Approx.

Disclaimer
Rates are updated every 24hrs

Stamp Duty

£
Approx.

Latest news and publications

Our customers

Excellent service

If you long for properties in the UK, please use their services! We have and are still having a great experience.

Asgher
Great service

Friendly, helpful and professional staff. Very pleased with my purchase.

Jessica
A very impressive company

I can’t really praise the service I’ve received highly enough. Personal, professional and very efficient. Charleigh has been with me the whole way and I can’t thank her enough. I would recommend this company to anyone!

Mr J Wild

Proud to be featured in